New Plant

KA11N2 LBtu CCPP - Key references

> CSA (Brazil) - KA11N2-2 LBtu - 490 MW
Customer: Companhia Siderurgica do Atlantico
Under construction

  • Captures low Btu waste gases and steam from a blast furnace installation to provide electricity comparable to a utility size power plant
  • A new power plant co-located with a steel mill to provide 490 MW for consumption at the facility and on the local power grid using waste blast furnace gas and heat scavenged from the iron smelting and coke making process.

> Bao Shan (China) – KA11N2-1 – 150 MW
Combined Heat and Power (CHP)
Customer: Baoshan Iron & Steel Co. Ltd
In commercial operation since 1997

  • Combined cycle power plant with steam export to steel mill
  • More than 77,000 fired hours
  • More than 200 starts to date
  • More MW is produced out of the same available Blast Furnace Gas (BFG) heat input.